Font Size: a A A

Research On The Determination And Compilation Method Of Construction Enterprsie Quota

Posted on:2010-08-12Degree:MasterType:Thesis
Country:ChinaCandidate:Z J YangFull Text:PDF
GTID:2189360278455076Subject:Technical Economics and Management
Abstract/Summary:PDF Full Text Request
Enterprise quota of construction enterprise is a constant rating that organizationally reflects the comprehend productivity of enterprise and management on the basis of cost date,and it is the foundation of external bidding and internal economic accounting. Construction enterprises compiled reflecting their own level of the enterprise under the the bill of qualities pricing method, it is the need of realizing independently pricing, promoting competitive ability of enterprise and participating international contracting of project.Based on the quota complement of important position and role, it researched the method of quota compilation,discussed the determination and compilation of quota. Focusing on the analysis of means of classification method quota and the improvement in original data analysis, it provided theoretical basis for plaiting quota efficiently and scientificly.The basic contents:(1) Researched the system of quota compilation, and put forward the steps of authorized personnel quota, based on analyzing the influential factors, compiling principle expansion, analyzing and improving compilation methods. The steps include the preparing work before compilation, collecting data, project classification, determination and compilation, proficiency test.(2) Sorted the project of quota according to ABC analysis, and proposed method according to the different quota program.(3) Analyzed the limitations of the current raw data processing, and put forward the improvement methods to ensure the accuracy of measurement data and authenticity.(4) Analyzed the necessity and feasibility of proficiency test to ensure the rationality and feasibility of Enterprise complement.The new ideas of this article:(1) Expanded preparation principle of enterprise quotas, and put forward using ABC analysis on enterprise quota.(2) Ascertained the observing numbers of construction quota and the outliers of raw data respectively by adopting the theory of student distribution ,sandard method and Grubbs norm. (3)Added a test of data authenticity, on the two stages of existing observation and analysising and eliminating raw values of frequency.(4) Put forward a proficiency test about preparation of enterprise quotas.
Keywords/Search Tags:enterprise quota, compilation method, ABC analysis, raw data, proficiency test
PDF Full Text Request
Related items