Font Size: a A A

The Construction Phase Cost Management Study About Xiyan Railway Signal Reconstruction Project

Posted on:2010-01-18Degree:MasterType:Thesis
Country:ChinaCandidate:C F GengFull Text:PDF
GTID:2189360278959142Subject:Project management
Abstract/Summary:PDF Full Text Request
Although it is a few years to be carrying out the project cost management in China construction, the project cost management is mere formality. It seems that the project cost management is carried out, and in fact it is in management experience or old management style. The targeted to the cost control is week. To this phenomenon, the paper discusses the cost management in the construction phase in theory and practice.The project cost management is most different from the traditional project management is that the cost plan is prior to the management----to determine the cost plan and objective---- the cost objective is the central on the implementation of dynamic management. The paper discusses chiefly the project cost plan and the cost control on the construction phase. The first chapter is the background of the project cost management and significance. The second chapter introduces the signal reconstruction project of Xi Yan railway briefly in order to facilitate the quote on the next part. Chapter III of the project cost plan starts to the project cost prediction, discusses procedures and methodology carried on of the project cost plan, and examples of how to compose. Chapter IV of the project cost control, it discusses the basis of the project cost control, principle, step, method and examples how to control the project cost. Chapter V sums up the project cost management of the signal reconstruction of Xi Yan Railway which is quoted by this paper.
Keywords/Search Tags:cost management, cost plan, cost control, dynamic management
PDF Full Text Request
Related items