Font Size: a A A

The Risk Assessment Of Taibus Transmission And Distribution Project Based On Interval Number Fuzzy Analysis

Posted on:2011-04-09Degree:MasterType:Thesis
Country:ChinaCandidate:W W YueFull Text:PDF
GTID:2189360305987806Subject:Project management
Abstract/Summary:PDF Full Text Request
Large transmission project cost, long construction period, and the technology is complex and involves more uncertainty, the construction of power transmission projects of high risk. Therefore, the strengthening of the power transmission project risk assessment study has important practical significance. This paper describes the basic theoretical knowledge of risk assessment; build a transmission project risk evaluation index system is established based on interval fuzzy analysis method of risk assessment model; and Taibus 220kV power transmission project to analyze, verify that the index system and model of rationality and feasibility of, and for the actual situation of the project put forward specific recommendations for risk prevention.
Keywords/Search Tags:transmission and distribution project, risk assessment, interval number, risk aversion
PDF Full Text Request
Related items