Font Size: a A A

Research On Thermal Power Construction Project Bidding Risk Analysis And Preventive Measures

Posted on:2011-08-08Degree:MasterType:Thesis
Country:ChinaCandidate:Q YuanFull Text:PDF
GTID:2189360305987832Subject:Project management
Abstract/Summary:PDF Full Text Request
With China's sustained rapid development leading to aggravate power supply and demand contradiction, at present power construction is the major initiative to resolve the current conflict. China's power market tend to standardization scale, thermal power projects are being formed to bidding as the main trading market competition situation.This article is based on the research background and purpose,we set the risk evaluation index system of thermal power construction project bids. With AHP and Fuzzy Comprehensive Evaluation combination to establish a risk assessment model for tendering the project.We take Inner Mongolia Power Company Limited H 2×600MW project for example to verify the practicality and effectiveness of the system. Finally, considering of thermal power construction project's bidding risk characteristics, We offer some risk control measures, as long as the aim is to to provide some guidance and reference for China's thermal power construction project bidding risk management.
Keywords/Search Tags:Thermal Power Construction Project, Bidding Risk, AHP, Fuzzy Comprehensive Evaluation
PDF Full Text Request
Related items