Font Size: a A A

Diagnostic Report On Yingrui Expressway Construction Project Management

Posted on:2011-02-12Degree:MasterType:Thesis
Country:ChinaCandidate:X P LiFull Text:PDF
GTID:2189360308473809Subject:Business Administration
Abstract/Summary:PDF Full Text Request
The paper based on the expressway project management theory and method analysis the present of Yingrui expressway construction project management with field survey,the combination of qualitative analysis and quantitative analysis and puts forward the improvement measure in accordance with the problems of Yingrui expressway construction project management.Specific research conclusions are as follows.Yingrui expressway project management has the following features through questionnaires,interviews with experts,and field survey:(1)scientific organization structure(2)the owner control-strengthening the management mode(3) paying more attention to the evaluation and control of the work of construction and supervision(4) strict supervision management system(5)taking quality control seriously(6) scientific decision-making and standardize operation,(7)humanization management,(8) the construction of information management system.Diagnostics of Yingrui expressway construction project management from the present problems and the key element which effects the management performance is based on field survey and literature analysis.In present, the problems of Yingrui expressway construction project management are lying in job distribution schedule and quality management, imperfect information management.lack of human resource management.For the depth reason,Yingrui expressway construction project adopts the agent-construction system mode. In the implementation of the model also exist some corresponding problems,mainly in the following aspects:(1) imperfect contract management, (2)the need of improving professional level, (3) inequality relationship between owner and supervision (4) ineffective communication, (5) various risks.The suggestions is based diagnostics analysis.(1)making Yingrui expressway construction project management organization system perfect, (2) optimization Yingrui expressway construction project management process control, (3) improving Yingrui expressway construction project management incentive mechanism, (4) taking measure to make external environment better.
Keywords/Search Tags:Yingrui expressway, project management, diagnostic
PDF Full Text Request
Related items