Font Size: a A A

Project Management Research For A Product Implement Procudure

Posted on:2011-03-19Degree:MasterType:Thesis
Country:ChinaCandidate:Q F ZhangFull Text:PDF
GTID:2189360308952561Subject:Project management
Abstract/Summary:PDF Full Text Request
There are many problems within Chinese manufactory and internal management, along with the supporting of government, the Fiber optics meets a great opportunity with the abundant requirements from the field of IPTV and FTTX, but nowadays, the consumption of high quality ceramic ferrule depends on the international vendor. For the Chinese ferrule maker, it is the urgent problem that how to increase the industrial productivity with high yield rate and high performance ferrule.In the age of Information Technology, the enterprise must use the Project Management Theory, improve the competitive power. This article includes six sections; the first section is the introduction. The second section is the background introduction of Company S, in this section, the author introduces the problem, general information, production and technology information of Company S, and also analysis the product implement procedure of ceramic ferrule, raise the proposal solution and so on. The third section is the way of the solution. The Forth section is an example, with it, the author tells how to manage the ferrule production line with the theory of Project Initiation, Project Plan, Project Implementation, Project Control and Project Closing. The fifth section is the evaluation. And the sixth section is the summary and the expectation.In order to achieve the project, the project office uses the project management theory during the process of product implement. During the planning phase, the project office communicates with customer frequently and analysis the product implement process of all kinds of ceramic ferrule, and the production process is under well control with the good plan. During the doing phase, the project office tackle the key problem which is no any mature process. During the ending phase, the project office makes conclusion and corrective action, improve the productivity. After using the project management theory, the company's status is better than before obviously.
Keywords/Search Tags:Project Management, Product Implement, Fiber Optics, Ceramic Ferrule
PDF Full Text Request
Related items