| This paper taked Tianjin Railway station hub of Traffic project as an example, studied deeply planning method of complex project , maked up for the weaknesses of project management Model of home and abroad.it analyzed the Characters of Tianjin Railway station hub of Traffic project and project management Model .In the engineering planning, it mainly analyzed the existing problems in construction technology, Proposed and carried out a comparative analysis of the new construction technology, especially for the technical difficulties of excavation of the vice-square pit in the Tianjin railway station.In the carrying out the project planning, it respectively provides Ideas and methods to solve for the problemsof management planning in the different events. It also studied the construction agent system concerning Organizational structure, management system and management process in the Project Management.This paper is composed of the following innovative results:1. It taked the project lifecycle management efficiency and achievement of project objectives as a starting point, and studied the related to project planning methods and techniques,which provides guiding to the planning of the complex project in methodological and technical.2. The Successful experiences and lessons of failur in the carrying out the Tianjin Railway station hub of Traffic project are summarized by this analysis,which provides the experience reference to The successful and efficient management of the similar projects in tianjin even at national.3. It explored the problems of management systems, process control in the carrying out the government driving projects for public. |