Font Size: a A A

Risk Management Of The 29th Olympic Games Virtual Private Network (VLAN) Project

Posted on:2011-05-19Degree:MasterType:Thesis
Country:ChinaCandidate:W ShiFull Text:PDF
GTID:2189360308962302Subject:Project management
Abstract/Summary:PDF Full Text Request
The project risks are the possibility that a result of the project refers to the environment and conditions of their own uncertainties and subjective cannot be accurately foreseen or controlled that influence the final results and the expectations of the project. Project risk management is the process.During the operation of project, the various risks may obtain prior control, and to develop plans to circumvent the risk, so as to improve project profitability and achieve project objectives. Project risk management includes the project risk management plan, risk identification, analysis, and the composition of monitor. Most of them are in the process of project period needs to be updated.The chapter 1 introduces the great significance, features and background of the 29th Olympic Games virtual private network project. The chapter 2 introduces risk management concepts,theoretical foundation and the importance of the project risk management. According to the chapter 2,in chapter 3,we use risk management methods to manage risks.The chapter 4 is the core. We analyzed the risks with "probability and influence" matrix.With risk classification, we work out strategies, and monitoring implementation strategies to ensure the correctness of the technology. The chapter 5,I proposed distinctive risks, and discussed and analyzed them, obtained the results of the risks.In the last chapter, we introduced emphatically project results and project significance.How to project risk management to the implementation of major projects,the elimination of project potential safety problems, the formulation of project risks contingency plans to achieve the desired goals and comprehensive benefits and the overall optimization of the project, which has been attached great importance by the implementation of the project managers.This paper is using the theory of risk management to manage risks, and through the analysis and assessment, develops risk response strategies and plans.And we make strategies, plans,and effective monitoring for possible risks to ensure response correct implementation, as well as the successful completion of the final project.
Keywords/Search Tags:risk, project risks, risk management, virtual private network project
PDF Full Text Request
Related items