Font Size: a A A

Tailings Dam Stability Analysis And Safety Countermeasures

Posted on:2008-04-20Degree:MasterType:Thesis
Country:ChinaCandidate:W X WangFull Text:PDF
GTID:2191360215486728Subject:Safety Technology and Engineering
Abstract/Summary:PDF Full Text Request
Tailing pond is one of three major construction projects in mining. Its safety operation in the entire production process of mine enterprise has a very important significance, but the key to the safety operation of tailing pond is the stability of tailing dam. Tailing dam includes starter dam and embankment.In this paper, several easily confused concepts such as tailing, tailing pond, tailing dam, tailing starter dam are presented firstly, introducing the general condition of tailing pond in our country. Then limit equilibrium method which is usually used in stability analysis of tailing pond is adopted, and on this foundation analysis each factor affecting the stability of tailing dam. Based on the engineering case of Dongshan tailing pond, three main dams (include two main dams and a vice-dam) are the critical point of stability analysis according to spot investigation,checking related data to the project and analysising indoor data.The basis instance of DongShan tailing pond is introduced in this paper. Choose the stability of tailing dam to analysise correlative data. Take Tongji-dawning side-sloping software which is presently applying in geotechnical engineering world and comparative mature as tool.Three dams were used as analysis objectes. Analyse and count the stability of natural circulation , flood circulation and specific circulation,trace out slippage-face,and educe their safety factor.Undering the hypothesis of pond critical- state, separately analyse and count three dams unitary tailing stability of tailing thin-sand ,tailing powder-sand and tailing powder-soil.The paper introduces several ways of tailing pond safety assessment at last. Consulting correlative standard of tailing pond safety assessment, according as stability analytical result and base on mostly danger and disservice analyse recognising, tailing pond safety assessment conclusion is made out.Accordingly, pertinent advice of safety management and monitor is given,and accident meet an emergency advance-project is simultaneously weaved.
Keywords/Search Tags:tailing pond, tailing dam, stability, safety factor, safety Assessment
PDF Full Text Request
Related items