The Study Of Project Cost Control On Xuchang Vocational And Technical College Gymnasium

Posted on:2011-04-02Degree:MasterType:Thesis
Country:ChinaCandidate:Z P NiuFull Text:PDF
GTID:2192330338958301Subject:Architecture and Civil Engineering
Abstract/Summary:PDF Full Text Request
Along with our country national economy's rapid development and the capital construction investment scale's unceaing expansion, the construction project cost in China see a long-standing "three ultra" phenomenon construction project cost estimation budget exceeds the long-standing, budget and final accounts of the budget over-estimation, serious investment benefit management of the construction project, puzzling the construction project investment benefit seriously. Strengthens the building cost of projects management, that is to reasonably ascertain and effectively control engineering construction cost, whose goal is to utilize the resources reasonably thus increase the benefit, more than to control the investment in the approved scope.The Xuchang professional technology institute stadium project plan occupies a land area of the approximately 60 Chinese acres, the stadium divides into the main hall and the training hall, constructs the indoor outside elevation difference is 0.6 m. Total floor space:15985.69 m2, underground 2011.5 m2, ground floor space:13 974.19 m2, construction basis area:10 069.03 m2. Completes for can undertake state-level individual competitions and so on handball, basketball, volleyball, pingpong, tennis, gymnastics, weight lifting, may also take activity venues and so on convention, performance, not only may change the present situation which, the satisfied whole city mass culture sports need my city large-scale sports facilities are insufficient, simultaneously to will consummate the urban function, to promote the urban image, the expanded opening to the outside world also to have the positive influence.This article take the Xuchang professional technology institute stadium project as a carrier, take the items of basic construction building cost of projects's determination and the control elementary theory as the instruction, the discussion and the research construction project in the project decision-making, the design, implements three stage building cost of projects the management, diligently optimalizing, most feasible control engineering construction cost method and measure. Through to the static investment and the dynamic investment part's estimate method study, carries on the control to the project decision-making stage's building cost of projects; The analysis design stage construction cost control's significance as well as our country design stage construction cost management's present situation, the construction design stage building cost of projects control mode, carries on the construction cost control using value engineering's method the research; Through based on the resilience detailed list valuation model under the move of bid stage building cost of projects control, the construction stage building cost of projects's dynamic control and completion settlement stage's construction cost regulatory measures' discussion, implements the entire process to the project to carry on the active control, reduces the building cost of projects diligently.
Keywords/Search Tags:Building engineering, Cost control, Value engineering, Engineering bill pricing
PDF Full Text Request
Related items