Font Size: a A A

Company A 2 กม 1000mw Unit Changed To Expand The Engineering Feasibility Study

Posted on:2011-06-10Degree:MasterType:Thesis
Country:ChinaCandidate:Z G DaiFull Text:PDF
GTID:2192360302498761Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
Along with China's economic and social high-speed development, consumption of resources increases increasingly.energy sources security is becoming the core of China's economic security issues. Efficient use of resources, reducing environmental pollution call for China must speed up the optimization and upgrading of industrial structure, change the mode of economic growth. In the context of China's industry and energy policy progress adjustment, high-capacity power generating units in the generation market to highlight the increasingly competitive advantages. Generating enterprises face of the new situation, how to improve enterprise competitiveness, led to our attention and reflection. Put into operation in high efficiency, clean power unit fire to replace the small thermal power units for power generation,in favor of resource conservation and environmental protection,is to enhance the competitiveness of enterprises an effective way.This article introduces A Powe Co.Ltd composition and the current status quo, indicate the need for expand the project, carried out a detailed analysis of the basic conditions for the project, with an emphasis on the implementation of projects to expand the program, and optimization of various technical options and selection, analysis of expand the project there may be difficulties, clearly the relevant solutions.The implementation of the project is to extend the analysis of the economy, the company "to big for the small" to extend the conclusions of the feasibility project.
Keywords/Search Tags:Power plant extend, Feasibility, Study
PDF Full Text Request
Related items