| Development and construction of Zhundong Wucaiwan power plant (2×660MW) project, not only in line with the needs of local economic development, but also in line with the national strategy for energy security needs, but also in line with the national industrial and industrial policy and development related planning.The project selection of high parameters, large capacity, high efficiency and ultra water-saving energy-saving environmental protection unit, in close connection with the surrounding coal resources, efforts to build into a low cost, high operating efficiency, achieve high efficiency of pithead power plant. After the project is put into operation, it can ensure the local power demand, drive the local economy and social development. For the unity of the local people, to build a harmonious socialist society to make its due contribution.This thesis first briefly introduces the background and significance of the project feasibility study, and expounds the significance of the project construction. Secondly, the thesis explains the full nature of the research project. In the third chapter, the power market of the project is analyzed in detail, including the status of the power supply system, load forecasting and power balance and so on. The fourth chapter describes the project selection, the project construction conditions, and project plan. The fifth chapter is the financial analysis of the project, including the project construction investment estimation, the source of funds and financing plan, and finally to evaluate the basic data of the project investment. Through analysis shows that the project has good economic and social benefits, can achieve the expected, the development prospects, can be successfully implemented. |