Font Size: a A A

Feasibility Study On The Second Phase Expansion Project Of Xinjiang Fukang Power Plant

Posted on:2012-07-15Degree:MasterType:Thesis
Country:ChinaCandidate:D ZhangFull Text:PDF
GTID:2352330374989378Subject:Business Administration
Abstract/Summary:PDF Full Text Request
In recent years, along with the rapid development of economic construction in xinjiang, power demand is growing rapidly, in order to meet the needs of the development of the economy, combined with the power development planning, xinjiang was kang energy development Co., LTD, timely in xinjiang were suggested the second-phase extension project power was kang. According to xinjiang grid electric power development planning, according to the load forecast (prediction to2020), study the construction of the necessary and feasibility, and its role in the grid system, puts forward the power plant access system solutions.For power plant operation must guarantee the fountainhead discussed:this project for coal-fired power integration project, planning and construction of ZhunDong shows great well-JiangJunMiao coal mine for this project fountainhead, coal and power plants simultaneous construction of production time and capacity are satisfactory power plant needs.To plant site are discussed:in the first phase project obligate expansion end construction. The factory is located in the xinjiang uygur autonomous region attended FuKangShi territory. This factory is located in the western FuKangShi westward about2kilometers namely for meters springs, bound, Sites with NATO6km for "500" reservoir, Edom every reservoir road about one kilometer for planning of ZhunDong petroleum base, Site of about0.4kilometers south of highway, and for303parallel uriku-Kennedy railway, vomit uriah high-graded highway216national highway), the factory for empty desert—grassland around. Transportation is convenient, the conditions which conform to the requirements established. Fuel transport by railway transport, construction of railway, since ZhunDong mining with existing railway rails gump udinese-after the wigan railway connect power plant udinese-the new railway private sidings, fuel to the factory from coal mine by the above paths transport into the factory.Installed scheme and the main building layout:to carry out special research installed scheme, according to the current national electric power development industrial policy, this project is recommended for the300mw subcritical air-cooling unit, deal simultaneously with homemade300MW air-cooled unit of supercritical manufacture, application prospects of relevant expositions. Main building layout to "side of coal" and "four row type" scheme, technical and economic comparison. In this project, air-cooled system and combining the engineering as location meteorologic characters, this project by direct air-cooling technology and indirect air-cooled comprehensive technical and economic comparison, proposed recommendation opinions.Combining the eia report, further analyze the engineering major pollutants:smoke, dust, noise, wastewater treatment and discharge situation of eia, meet all requirements. At the same time this project will period construction FGD systems, obligate denitration condition, not only guarantees now, also ensure future can achieve environmental protection requirement.In this paper, based on the standard work out calculated total project equipments and project total investment is calculated and the project of the main economic indicators, and the break-even point even the social benefit is analyzed. Through for project of investment estimate and financing, financial evaluation, obtained power project feasibility analysis conclusion.To sum up, the project from power market demand on look is necessary, from natural conditions on look is feasible, for comprehensive utilization of resources and environmental protection is advantageous in technology, economically rational, in conformity with the relevant state industrial policy, has the good social benefits and economic benefits. Suggestions for the construction of the early work, in order to obtain benefits as soon as possible...
Keywords/Search Tags:power plant, construction, feasibility
PDF Full Text Request
Related items