Font Size: a A A

Study On Project Control Management And Design Change During The Rapid Development Of Highway

Posted on:2011-03-20Degree:MasterType:Thesis
Country:ChinaCandidate:J R YaoFull Text:PDF
GTID:2199330335992544Subject:Traffic and Transportation Engineering
Abstract/Summary:PDF Full Text Request
In recent years, as the rapid development of the socio-economic, the fund of highway is increased, and the corresponding transport systems are shaped. However, the schedule management, quality management and cost management are always hard to coordinate, which is the project technical difficulties faced by managers. At the same time, the projects often produce design changes, which lead to the management of inconvenience. Therefore, the project control management and design change during the rapid practical of highway is studied, which has the important practical significance.The study object is management of highway construction project, on the basis of control theory, and the starting point of project systems management, the principles and methods for schedule control, quality control and cost control are highly analyzed, which provide the basis for the coordination between the schedule and quality control.The schedule and quality control of highway construction project is the core, and is to determine the key to success. On the basis of analysis of factors for schedule and quality control, and the interrelation coordinative mechanism between schedule and quality control are deeply studied. And then the stakeholder theory is used to construct a coordination management mechanism of highway project progress between schedule and quality control.After the reasons of design changes are analyzed, the current management practices and regulations change are in-depth analysis, and then the problems of design change management are pointed out. In order to control design changes, the corresponding rules and control strategies of design changes are proposed.The full-article combined the basic principles of control system closely, rely on the Nan-Yu Road, the quality and schedule control of this road is systematically researched, and the coordinative relation is analyzed, the results have shown that the quality and schedule are in control. And then the design changes of this road are studied, the results are that the subgrade and bridge project are a major caused the design changes, should strengthen management.
Keywords/Search Tags:highway construction project, quality control, schedule control, interrelation coordinative relation, stakeholder, design change
PDF Full Text Request
Related items