Font Size: a A A

.3 G Telecommunications Network Project Control

Posted on:2008-06-27Degree:MasterType:Thesis
Country:ChinaCandidate:S ZhangFull Text:PDF
GTID:2199360215961374Subject:Business Administration
Abstract/Summary:PDF Full Text Request
3G is discussing hotly now. Lots of money has been spent by entire industry chain. Most customers also expect to use 3G Operator hopes to get a license of 3G as soon as possible. Chinese government also promises to provide 3G service during Olympic Games period in 2008. So, it is very value to discuss related subjects about 3G networks construction. Since the 3G network construction projects are high-cost, numerous in sub-projects, calling for high quality and schedule in time, it is important to manage the 3G network construction projects carefully. This paper is discussing carefully about project management in 3G network on cost control, schedule control and quality control, hoping to give some advice to operators.For cost control, it is a ruthlessly competitive area in telecom market of China now. Restricted by many factors about investment in 3G, operators need to pay more attention to cost control in every phase of the 3G network construction projects. Estimating investment according to the facts in feasibility investigation, designing everything after your ability, imposing stringent bidding management for lowing investment, controlling cost with scientific management on every phase of working in construction, it is also important that auditing carefully after completing of project. Implementing an IT system of project management is also a good solution to strengthen cost control on every part.For schedule control, it is the first step that building a 3G network quickly to get customers early and hold market share. For ensuring speed of building network, an efficient management team needs to be gathered. After making a scientific plan, using regular meeting or something else to ensure schedule and paying more attention to venture management. Making use of an excellent IT project management system also can increase ability of project control.For quality control, a scientific quality control system needs to be built at the beginning of constructing 3G network. Training management team and selecting company of design, construction and surveillance carefully is also important. Constructing 3G network is a system project. In order to control quality of project efficient, every phase of project quality control needs to be watched. Customer satisfied investigation is also important to evaluate the quality of construct project in constructing phase and running-in phase.There are correlated, mutual-restricting and interdependent relations between cost control, schedule control and quality control. Restricted contract management is needed to achieve control purpose and achieve the purpose of finishing the 3G network construct with low-cost, less time and high quality.
Keywords/Search Tags:3G Network Project, Project Management, Project Control
PDF Full Text Request
Related items