Font Size: a A A

Suzhou Dongsheng Walking Street Project Construction And Installation Cost Of The Project Management Issues

Posted on:2009-06-30Degree:MasterType:Thesis
Country:ChinaCandidate:X J JiangFull Text:PDF
GTID:2199360245478668Subject:Business Administration
Abstract/Summary:PDF Full Text Request
In recent years, the adjustment and control policies of central government are strengthened gradually. The policies involve several aspects, such as: currency supply, earth supply, area of house, tax etc. It influences income of Real Estate Company hugely. Such trend will be continued. And with the investor of real estate item is more and more, the competitive between real estate companies will be more drastic. Under this situation, real estate company only can control own cost. The construction and installation's cost of real estate item is the biggest cost except earth cost. According to Suzhou DongSheng walking streets item, the thesis analyzes the situation of cost control and draws the conclusion.In design stage, the excellent design company should be chosen. And pushing quota design and strengthening harmony between several design companies are very important.In the stage of inviting public bidding, it is necessary to choose better overseeing institute and Construction Company. The real estate company should establish perfect file of inviting public bidding, strengthen risk consciousness and utilize contract management to control construction & installation's cost.In the stage of implementing item, it is very important to strengthen management of changing design and signing certification.In balance stage, the real estate company should choose excellent audit institute, strengthen own checking and supervise project quality of consultation company.
Keywords/Search Tags:real estate item, construction and installation's cost, management
PDF Full Text Request
Related items