The The Changtan West Expressway Project The Whole Process Of Cost Management

Posted on:2008-12-30Degree:MasterType:Thesis
Country:ChinaCandidate:L Y YinFull Text:PDF
GTID:2199360245982553Subject:Business Administration
Abstract/Summary:PDF Full Text Request
With continuously increasing of Chinese economy and under national macro-policy, the highway industry develops rapidly. Cost management is one important part of highway construction management. The investigation indicated that losing control of cost is common phenomenon in highways construction. So that its influences on highway construction and economic developing stably cannot be neglected. Therefore, how to make the cost management mode of highway engineering accommodate to the Chinese economy increasing is one important program to solve urgently.Cost management of Chinese engineering contains characteristics of obvious different stage by analyzing cost management modes of international engineering. In whole life cycle of the highway construction, it maybe lose control of cost because of many factors, including uncontinuous of the cost data backlog and changes of cost-control engineers and design changes, etc.. Because of engineering construction with a process of its original cost data backlog, it makes the same set of principle repetition of all cost data which can connect up properly and look back at standardize the management's process. Therefore, the whole process cost management mode is better than that of different sections of engineering construction.Therefore, based on the theory frame and the project practice of west developed countries, some flaws of the whole-process cost control on Changsha-Xiangtan West Line Highway have been analyzed. It's brought up that cost management of highway engineering must combine theory of value project and quota design and earned value, etc. and enforce the real-time control, plans selecting from the point of whole life cycle of project. So that the frame of the whole-process cost control with Chinese characteristic could be formatted in order to strengthening cost management of highway engineering. The study of the case in the paper indicates that there are some disadvantages of different sections cost management mode of Chinese highway engineering obviously. The whole process cost management mode of Chinese highway engineering must be adopted necessarily.
Keywords/Search Tags:Construction Engineering, Project Management, Cost Management, Whole Process
PDF Full Text Request
Related items