Font Size: a A A

Zibo Netcom Broadband Man Upgrading Project On Decision-making

Posted on:2010-06-09Degree:MasterType:Thesis
Country:ChinaCandidate:W LiFull Text:PDF
GTID:2199360275485742Subject:Project management
Abstract/Summary:PDF Full Text Request
In recent years, the Zibo Netcom users, broadband Internet users greater growth rate, large customers, groups of users demand for broadband access, intelligent optical access needs of the area have increased dramatically. The rapid growth of user demand, broadband IP MAN Zibo made the network construction to the comprehensive, detailed, relatively long-term planning, network architecture exists not reasonable; other existing business model of a single network, incremental Without increasing income, there is no scale of network construction, to meet users for Internet access and quality of service and security, and many other needs, therefore, improve the IP MAN network structure, enhance the comprehensive business IP network carrying capacity, building efficient, Security IP MAN Zibo Netcom is an urgent need to solve a major problem.In this paper, the question is: Through the Zibo Netcom existing broadband IP MAN network structure, equipment use, network security and user areas such as the use of in-depth and meticulous analysis of the existing network to identify problems in a comprehensive consideration of technology , Economic and environmental factors on the basis of determining the order of the network structure, eventually forming a reasonable and feasible programme of reform to achieve good social and economic benefits.For this complex decision-making, the paper proposed for the first time based on the level of analysis MAN optimization of the programme. AHP is a systems engineering project in the event of non-quantitative quantitative analysis of a simple method, but also on people's subjective judgement of an objective description of an effective method. MAN optimization of the general thinking is, Metro, accumulated after years of construction, already has a considerable scale, network-building step to achieve the ultimate goal of the structure and requirements, the need for large-scale investment and complexity of the implementation process, at this stage IP City Net domain of the need to go through a gradual transformation of the optimization process, the entire network should be phased step-by-step transformation: metro backbone network equipment and optimize the structure of the transformation in the metro backbone network configuration quality of services and virtual private network For the business needs more specific Area Broadband Access Network for the pilot reform. In order to better achieve goals, use of AHP from the communications business costs, operating expenses, equipment configuration requirements, operational security, multi-service carrying capacity, and other qualitative and quantitative indicators, the establishment of a MAN design optimization model , The evaluation of the comprehensive evaluation conducted by the priority targets of the comprehensive weight to determine the order of the various objects, the development of a reasonable solution,Finally, examples of analysis based on the level of Zibo Netcom MAN transformation methods were verified. The results show that the level of analysis based on the IP MAN Netcom transformation can be a good way to consider the necessary qualitative and quantitative factors, experts of the decision-making intent, a reasonable decision-making results. In actual use, In accordance with decision-makers can also adjust the intention of the goals and criteria for decision-making, thus the method has good flexibility and adaptability. In short, over the past two years of operation has proven: Zibo Netcom MAN transformation project is a success. MAN building so that Netcom Corporation business increased significantly, competitiveness significantly enhanced. At the same time, local economic development has played a catalytic role for the development and strengthening of Netcom Corporation laid a solid foundation.
Keywords/Search Tags:Metropolitan area network transformation, Project decision-making, Analytic hierarchy process
PDF Full Text Request
Related items