In recent years, with the developing economy, more and more enterprises have been recognizing the function of technical advancement to themselves as well as the importance of technical reform. However weather the tech-alteration can achieve a successful result will enflunce directly on the prior integrate design. In this paper, the studying object is the integrate design of the 10th five year emphasing tech-alterative project for WuHu Cig.CF. in this phase, studying how to handle the idiographic mehords and tools of morden project management to design and anlyse in the tech-way for this project of integrate plan. And chose the feasible implement design . through arolzing and comparing the integrate design the specific contednt of the implement will be decomposed and much more pesfect. Through the way of contrast analyzing "with and without", also the sensitive arolyse and the budget of profit and loss balance this anolyse and average can be carried out so as to reduce the potential risk for the enterprise afer the project being implemented. |