| Platform Screen Doors System is a commonly used special equipment of Modern metro and train. in underground stations with air-conditioning systems, use the Platform Screen Doors System can save 30% of energy. So far, the core technology is still mastered by several large foreign companies, and thus its sinifying development and production is necessary. There have high requirements on the personnel, capital and management in the development process of the project, how to distinguish, analysis and control the various risk factors may exist in the project, has become the key to the successfully complete the project.In this paper, on the basis of collect, collate, study a large number of literature, drawing on the successful practice of risk management, through analysis the Platform Screen Doors Profession and the background of A industry, study on it's major scientific and technological special project of Henan Province, the risk factors of Platform Screen Doors project is divided into political factors, technological process factors, and financial factors, project management factors. Using Delphi and Brainstorming to find Platform Screen Doors project's main risk factors, systematic study of risk factors for Platform Screen Doors project evaluation and analysis methods and control measures. Using key control method for the key risk factors, Work Breakdown Structure, Gantt charts and other methods to control the risk of development process, to complete the Platform Screen Doors project Successfully.This study features:â‘ First proposed the comprehensive risk control of Platform Screen Doors project.â‘¡Using the expert scoring method, decision tree method, Break-even method, and other methods of project risks to research on the risk type and control strategy of Platform Screen Doors project.â‘¢Put forward the risk analysis and control methods about Platform Screen Doors project.Through this study, provide a set of risk factors for Platform Screen Doors project identification, evaluation and analysis methods, determined the operational methods of the key risk factors of Platform Screen Doors project, provided available risk control measures about the major scientific and technological special project of Henan Province. |