Font Size: a A A

The Quzhou Electrical Network Impractical Transmission Line Prevente Dancing Government Research

Posted on:2013-01-16Degree:MasterType:Thesis
Country:ChinaCandidate:A M XuFull Text:PDF
GTID:2212330371956948Subject:Electrical engineering
Abstract/Summary:PDF Full Text Request
Along with the electric power production and the construction unceasing development,the electric power reliable supply and the high-quality service request is more and more high.Regarding the power supply enterprise,both must guarantee the normal electric power supply and the high grade service front, and wants the various schemes to enhance the electrical network resistance disaster and sudden outbreak ability.The related historical data record,the electrical network often receives the earthquake,the typhoon,the flood,the lightning damage, the snow and ice disaster and so on the natural disaster influence, simultaneously receives the external force to destroy, the forest fire in the mountains, the bird damage, other animal disaster and so on the natural environment and the active threat.Although the electric power department and some enterprises and institutions experts through the technical innovation, have adopted some advanced science and technology method, has made the tremendous contribution for the electrical network development and the progress, but some disasters and the activity the influence and the threat still exist to the electrical network.In recent years,the impractical transmission line waved the electrical network disaster which created more and more to arouse people's interest.This article the impractical transmission line which occurs in view of the Quzhou electrical network waves the event,first introduced the transmission line waves the mechanism,analyzed the Chu chou electrical network impractical transmission line to wave the reason,guarded against the dance government the concrete process and the measure, proposed guarded against the dance the comprehensive measure, unified the transmission line condition monitor technology and the monitoring center construction in particular,proposed possible to initiate the line through the monitoring prompt discovery to wave the phenomenon, adopted the prevention to control the measure in advance, reduced and avoids the impractical transmission line waving the trip to create the electrical network accident.
Keywords/Search Tags:The Quzhou electrical network, Impractical transmission line, Prevente dancing government, Concrete process, Comprehensive measure
PDF Full Text Request
Related items