Font Size: a A A

Project Management On Large-scale Song And Dance Show Based On WBS Theory

Posted on:2012-12-17Degree:MasterType:Thesis
Country:ChinaCandidate:X R PanFull Text:PDF
GTID:2215330368979618Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
WBS method is an advance on the evening of the human-specific quality of thinking. Show well the WBS method is to achieve an important guarantee for scientific decision-making, but also to achieve the desired goal, an important guarantee for improving the efficiency. WBS is a program, in essence, is a rational use of mental behavior. WBS methods show that there is such a pre-decided what to do, when to do it, how to do, who do. WBS method of party as a bridge, which connects the land of our current and future we have to go through the office. WBS method is based on the steps of the party based on the objectives set, and then set strategies, policies, and detailed internal operating plan, in order to achieve their goals. Finally, including the effect of assessment and feedback, back to the beginning of the show to begin WBS method of the second cycle.In fact, the concept of the method is widely WBS, WBS is you have to do in advance to be project management, a comprehensive, but also on some aspects. Method is a strategy, so you can do to make detailed implementation and operation of comprehensive, we hope things will go good with the effects of development. Of course, WBS proven this method to the investigation and analysis, to be practical, easy to perform and to be able to perform, or is a waste. Good evening project WBS, also need to have good execution.Party planners in the eyes of the understanding of the WBS method is more sensitive, with WBS theory, the whole party have broken down into numerous inter-related project tasks. If no such items are classified and task decomposition, face many complex dance party items, often feel that there is no clue, can not find the party after the project should be what to do first what to do. So we have a number of WBS are easy to organize the work of the project, eventually to form a perfect project management plan.We can show the WBS method is defined as: WBS method is a process of party, it is to achieve the success of large-scale dance party held in the full use of existing resources, under the premise by presenting creative, design, planning and other methods, for the party planning to provide the best solution.In this paper, theoretical methods based on WBS, focusing on large-scale singing and dancing, designed to structure the framework of large-scale song and dance show reasonable arrangements for the project work and organizations with advanced project management, the full realization of scientific and standardized project management. This article focuses on dance party project management research in the following aspects to study:First, party planning, the main goal of gradually refined decomposition. Second, the party of the group, can not be broken down into sub so far. Third, the party should correspond to the daily activities of people, time and money. Fourth, the party planning projects. Preparations for large-scale dance party to ensure the smooth progress of work and show schedule shelf life complete.
Keywords/Search Tags:WBS, Dance party, Study
PDF Full Text Request
Related items