The Project Management Research Of "The Boat Of The Asian Games"-Haixinsha Project

Posted on:2012-11-17Degree:MasterType:Thesis
Country:ChinaCandidate:M Z ChenFull Text:PDF
GTID:2219330338466529Subject:Project management
Abstract/Summary:PDF Full Text Request
In early 2009, the opening ceremony of the 16th Asian Games in the Haixinsha island off the site. April 17,2009 the construction of units to be entrusted with the task. At this point, just from the Asian Games opening ceremony more than one year, the total cost is about 23.6 million. Project scale, short duration, many professionals, the difficulty of large beyond imagination. It is also urgent, difficult, heavy Haixinsha project complexity and diversity, making the project management theory and methods of application with full stage.In this paper, opening and closing ceremonies of the 16th Asian Games venues, "The Boat of The Asian Games " ---- the construction of Haixinsha project implementation phase, through the full contents of six chapters, the first overview of the project described the Haixinsha project, and then were to Project organization, schedule control, quality management, risk management and other aspects, introduced some basic knowledge of project management, combined with characteristics of the project, combined with project management theory and methods in the Haixinsha practical application of research projects, analyze Describes the Haixinsha project organizational structure and its functions divided. Focused on the Haixinsha project, the progress of the project objectives of Haixinsha project structure decomposition progress of the project, Haixinsha project preparation of the project construction schedule, Haixinsha project control project progress factors, Haixinsha project control project construction schedule management of five Depth analysis of aspects to the Haixinsha project construction schedule control and management. Meanwhile, the introduction of the Haixinsha Project Management Construction Quality Control of the use of project management theory and methods to determine the project quality assurance system, the preparation of quality management; the quality system functions of the distribution, the development of specific quality management processes and quality control measures, the Haixinsha quality control management Project Experience. Finally, the risk characteristics of projects and project risk management, project risk through the analysis of the situation, and then on the political risk, economic risk, legal risk (contract risk), risks of natural risks and collaborators five factors to research the Haixinsha project risk management.Discussion of Haixinsha project management model for the future implementation of similar projects provides valuable experience has a very important and far-reaching significance.
Keywords/Search Tags:Haixinsha Project, Project management, Scheduling, Quality control, Risk management
PDF Full Text Request
Related items