Font Size: a A A

Study Of Liu Shuquan Power Transmission And Transformation Project Incubation

Posted on:2012-02-24Degree:MasterType:Thesis
Country:ChinaCandidate:H Q YinFull Text:PDF
GTID:2219330338468679Subject:Project management
Abstract/Summary:PDF Full Text Request
In recent years, with the Tangshan region sustained and rapid development of industrial, Fengnan Industrial Development Zone of Tangshan City, electricity load rapid growth also, increasingly severe form of the power supply, power transmission project construction is to adapt the national economy in Tangshan area. The need for sustained and rapid development came into being, the project will further improve the north china power grid structure and improve the supply capacity of Tangshan region and supply reliability, ease the tight supply situation in the region, while promoting economic development in the region .To understanding the project incubation for the initial activities, through investment opportunities identified, selected project proposals, project feasibility studies and project planning process to control the whole project, to determine the overall direction of the project itself and the entire life cycle has practical significance. From the station site, technical, economic, environmental and other aspects of the planning of Liu Shuquan power transmission engineering projects. In electrical engineering technology from the first, secondary electrical, general layout, civil engineering structure, ventilation, drainage, power transmission line path and vision; in terms of economic estimates meet the engineering requirements; in environment protection and energy-related areas in line with national policy Requirements.
Keywords/Search Tags:power transmission and transformation project, project incubation, load forecasting
PDF Full Text Request
Related items