Font Size: a A A

Economic Evaluation About Cogeneration Project In The Southern Suburbs Of Baoding Thermal Power Plant

Posted on:2012-05-26Degree:MasterType:Thesis
Country:ChinaCandidate:H ZhouFull Text:PDF
GTID:2219330338468950Subject:Project management
Abstract/Summary:PDF Full Text Request
The construction of power industrial projects belong to technology-intensive, capital-intensive basic industries, also is the most important energy project, is one of the basic industrial construction , directly affects the healthy development and balance of our economy. In recent years, with urban construction and the rapid economic development of the Qingyuan County and Baoding City, the continuous improvement of living standards, industrial steam and heating steam consumption increased rapidly, supply and demand is very prominent. Construction of the southern suburbs of Baoding Thermal Power Plant project will implement the construction of Baoding district heating planning of the southern heat source, After the completion of the project, will greatly improved the environment of the southern in Baoding City and Qingyuan County, Meanwhile, Qingyuan County, Baoding, south and make a positive contribution to economic development of Baoding City and Qingyuan County.Based on the research of international and dynamic, with the southern suburbs of Baoding Thermal Power Plant project as the research object, first Introduced the theory of economic evaluation about Thermal power plant, including the content and methods of economic evaluation, On this basis, combined with the specific characteristics of the project, from the project construction conditions, heat load planning ,analyzes the feasibility of the project, and the implementation of the project .Finally, identified the key factors impacting the economic evaluation of project, discussed energy management, general management, fuel management, and production equipment management of economic evaluation,using AHP and fuzzy comprehensive evaluation method, proceeding Comprehensive economic evaluation to the project, make the argument fully, a scientific and rational, realistic economic evaluation to the southern suburbs of Baoding Thermal Power Plant Project Concluded that the technical, economic indicators of the project installation plan are in line with the relevant requirements, economic, social environmental effects of the project are good, with a strong ability to bid online and anti-risk ability, that the project both technically and economically is feasible.which will improve the development of economic.
Keywords/Search Tags:combined heating and power production, feasibility study, financial analysis
PDF Full Text Request
Related items