Research On Glaims Caused By Uncontrollable Factors In Engineering Project

Posted on:2012-12-20Degree:MasterType:Thesis
Country:ChinaCandidate:Y BiFull Text:PDF
GTID:2219330338957306Subject:Architecture and Civil Engineering
Abstract/Summary:PDF Full Text Request
International engineering in the international and domestic development of construction market is strong in the background of global economic integration, with China's accession to the WTO,, a variety of overseas construction projects of international cooperation are gradually increased, China's construction projects management system is constantly in the development and improvement. However, due to the complexity of the project itself, systematic and long-term, so many factors can change; the process of implementation of specific types of problems that may occur a lot, but the contract itself, for various reasons cannot fully reflect all issues.With the substantial increase in investment in the global engineering, construction claims in all types of construction projects is still relatively concentrated part of the problem and solve engineering claims disputes and economic problems related to the current implementation of the project is still the key of the engineering field focus on. And in various types of claims, non-controllable factors of the problem are one of the main incentives.In view of the systematic study of the non-controllable factors for the claim is still relatively less in the domestic, this paper begin with the starting point for the controlled factor especially force majeure cause project claim characteristics, and through comparing the domestic and foreign relevant development of engineering project, first, summarize and analysis the basic theory of the claim; and then abusive the relevant project performance and the systematic analysis of several related cases, the initial inquiry of the relevant root of the problem, especially for non-controllable factors which caused the force majeure claim the projects were focused on the calculation and the related claims summarized; finally, through summarizes the analysis the article put forward for including contractors, engineering contracting business are all ways to improve the level of claims management, especially for non-controllable factors of the project measures specific guidance of the claims.
Keywords/Search Tags:Project management, Claim Non-controllable factors, Force majeure
PDF Full Text Request
Related items