Font Size: a A A

The Research Of Storage Yard Reconstructing And Planning In Tianjin Port Coal Terminal

Posted on:2013-02-14Degree:MasterType:Thesis
Country:ChinaCandidate:Y LiFull Text:PDF
GTID:2219330362960842Subject:Logistics Engineering
Abstract/Summary:PDF Full Text Request
Tianjin Port cargo throughput exceeded 4 hundred million tons in 2010, it continued to maintain the first port's position in the north of china. Coal is the largest cargo loading and unloading of Tianjin Port, its throughput increased steadily year after year. Tianjin Port coal throughput reached 67 million tons in 2010, it's located in the third. As a world-class professional Coal Dock Company, Coal Terminal Company is the largest coal handling company in Tianjin Port, its coal throughput reached 35 million tons in 2010, accounting for Tianjin Port coal handling capacity 52%.But at present, due to the two pressure's effect, Coal Terminal Company will face a severe test, the two pressure is the fierce competition of port coal business in Circum-Binhai-sea region and bulk cargo logistics center's be moved that is in order to guarantee the development of Binhai new area. The main contents of this thesis is to research the possibility of storage yard reconstructed in Coal Terminal Company and the effect of the new projects for coal terminal company production and management after storage yard reconstructed, which for coal terminal company can continue to survive and develop has important significance.This thesis complies with the following thinking: clarifying question, analysis, planning and design and getting conclusion, it is led by the logistics facility layout theory and the port handling process to reconstruct and plan the coal terminal company storage yard. Its main contents including: the new projects and their related requirements analysis, these new projects are coal crushing and screening, lump coal packing and container lighting; the existing situation of coal terminal company storage yard analysis; according to the coal train transport, motor transport and belt corridor in different forms as well as the owner and coal of the different, it in the storage yard were reasonable stacking research; economic efficiency and competitive advantage assess after the storage yard will be reconstructed. Finally, this paper draws conclusion: in does not affect the normal production condition, coal terminal company storage yard can completely meet the needs of the new projects operation after that will be reconstructed; these new projects will bring enormous economic benefits, and make the company gets rapid growth.
Keywords/Search Tags:coal terminal, storage yard planning, facility layout, coal crushing and screening, lump coal packing
PDF Full Text Request
Related items