Font Size: a A A

Water Resources Argumentation For Dunhua Jilin Pumped Storage Station

Posted on:2013-02-20Degree:MasterType:Thesis
Country:ChinaCandidate:C ChenFull Text:PDF
GTID:2232330371484378Subject:Hydraulic engineering
Abstract/Summary:PDF Full Text Request
Water Resources Argumentation for Dunhua Jilin Pumped Storage Stationwhich is one of recent works of the choice of site planning report recommended, canassume the task of Jilin peak shaving and valley filling, FM, phase modulationandemergency standby, and to improve grid power quality and supply reliability, andoptimize system powerstructure, to improve coal-fired thermal power and other unitsoperating conditions, improve the economy of grid operation, the project plays animportant role. The operation of the project would reduce the fuel consumption ofthermal power units to reduce the harmful gases and greenhouse gas emissions andenergy conservation.This paper first introduced the project survey of Dunhua Jilin Pumped StorageStation, detail of description of the status and all relevant factors, analysis of therationality and calculation of the yield of consuming or drawing water. Secondly, baseon the hydrological data of Ermu hydrological station, Xibeicha and Beidayangrainfall stations, Identify and proofreading of the project area runoff by three methods.In addition, develop a balance sheet of water according to the project needs. It has toonly considering the leakage evaporation cause of the water consumption. In waterquality, Implementation of surface water environmental quality standards, Reachedthe standard of typeⅠ. Detail the argument in the water and reasonable in terms of,fully meet the needs of the project on water. The part of water environmental impactIn this paper, To analyze at construction and water storage and running stage,conclusions of its adverse effects is minimal.In summary, Consider the organizational design to prepare a water conservationmeasures and recommendations, according to the water environment functionalrequirements of the project, dealing with the construction and operation of varioustypes of sewage and waste by the way of grit chamber, sedimentation tanks, greasetraps, sewage sets of treatment plant, and then Cycle or renewable comprehensiveutilization, To provide a basis for the project implementation and operation of watersector management.
Keywords/Search Tags:Water resources, power plants, the water resources assessment
PDF Full Text Request
Related items