Font Size: a A A

Research On Management Of Hohhot-baotou Expressway Reconstruction And Extension Projects

Posted on:2013-02-19Degree:MasterType:Thesis
Country:ChinaCandidate:Y J SunFull Text:PDF
GTID:2232330371982319Subject:Business Administration
Abstract/Summary:PDF Full Text Request
This paper bag highway called expansion project management as the researchobject, in view of the highway construction features of the reconstruction projects,through the investigation, this paper concludes, compare and contrast the theory withthe practice, and other methods, the analysis package called highway reconstructionprojects of the present situation of the construction project management, from ownerunit to highway project management perspective, this paper expounds the highwayreconstruction projects in the management of project quality control, progressmanagement, cost management, environment management, security management,traffic organization management, social factors of the main content management,summarizes the call package highway project management reconstruction projects, theexisting problems of the problem analysis, and connecting with the projectmanagement theory and Inner Mongolia autonomous region highway constructionmanagement system, the paper introduces the characteristic of call package highwayreconstruction projects of project management optimization method.This paper bag highway called reconstruction projects construction characteristics,and analysis package called highway reconstruction projects construction projectmanagement problems come to the conclusion that the reconstruction projectshighway project management in addition to project management of the three mainmanagement content: quality, schedule and cost management outside, environment,safety, traffic organization, social problem is also a highway project managementfocus on reconstruction projects; People-oriented management style and theconstruction of information platform of management methods continue to carry on, butin the concrete implementation process in owner and supervision overlappingfunctions, lack of effective management measures, the project informationmanagement, communication, professional and technical personnel, the lack of themany problems need to be solved urgently.Through the call package highway reconstruction projects project managementproblems analysis thinks: the owner of the project unit as a financial backer, shouldstrictly carry out the owner’s responsibility, not the Lord DaiPao, the engineeringsupervision party by rights should be "vacuum", eroded. Should according to ourcountry "highway engineering construction supervision standard" performengineering project management work; Perfect modern information managementmeans and management software, strengthen the application of modern managementtools to communicate. Call package for highway construction and projectmanagement and expansion shows the problems and the causes of the formation ofproblems and puts forward the call package of project management in thereconstruction projects optimization method.
Keywords/Search Tags:expressway, reconstruction and extension projects, the project ofmanagement, problem analysis, project optimization
PDF Full Text Request
Related items