| For the garden engineering,as the theory of engineering cost began late,most of the enterprises have not the perfect biding system,so it is the key to improve the ability of bidding quotation for the enterprise itself to develop better and faster and also fit the progress of the society.This paper has a detailed discussion about several rapid quotation method in China now and raise the necessity of the implementation of engineering bill pricing. At the same time,the writer emphasize the rapid price theory in the method of fuzzy mathematics, and summarise the concrete the process and way of price calculation. Also connect it with the constructional installation.For suiting the Landscape engineering bid quotation,same necessary modifications have been done an the basis of the relative cases of garden engineering. We selected four landscaping projects for the implementation of the forecast, three of them works as a typical known works, their analysis of the data, and close degree fuzzy relationship values, predictive calculation and prediction of test, allowed after the test the predictive value of the error range of5%, In line with our forecast, so Quick Quote therefore Fuzzy mathematical methods in the garden project is realistic and available.At last,the merits and drawbacks of fuzzy mathematics in landscape engineering biding have been analysed,and it will provide the feasible reference for the research latter. The fuzzy mathematics of fuzzy mathematical method to quantify some of the fuzzy relation in the garden, our tender estimates. The calculation process is simple and clear, the error between the calculated results and the actual cost can be controlled within a certain range. However, the lack of historical data reserve with the results of fuzzy mathematical method to estimate the offer validity period is limited, fuzzy mathematics most cost forecast can not provide a detailed forecast for profit and risk. |