Font Size: a A A

Bill Of Quantities Valuation Mode Andthe Application Of The Fixed Price Contract Conflict Studies

Posted on:2018-02-04Degree:MasterType:Thesis
Country:ChinaCandidate:Z H QianFull Text:PDF
GTID:2322330515969820Subject:Architecture and civil engineering
Abstract/Summary:PDF Full Text Request
Domestic at present there are two major in the field of project cost pricing mode,namely the quota valuation and the bill of quantities valuation,the core of the difference lies in the comprehensive unit price of the set price.Contract pricing mode there are many,the main also has two modes,namely the unit price contract and price contract,its core difference is based on the scope of project and project of the total value of the total risk.Cost pricing model with the contract pricing mode should be no mode itself,the risk of conflict.However,based on the 2013 version of the specification of the quantities bill valuation,risk for division of the convention “the tender bill of quantities must be as part of the tender documents,the tenderer is responsible for the accuracy and integrity”,and the price has the following contract the engineering of implementing the quantities bill valuation,it is suggested that choose to unit price contract;for the time is not long,technical difficulty is not high,the overall scale is not big,construction drawings have approved projects at the same time,can choose to conclude a contract for the total price,in fact more than agreed quantities bill valuation mode and the total price valuation model has the risk of conflict.In this paper,under the mode of pricing by bill of quantities using price contract denominated in case analysis,intends to clarify the risk of conflict,the quantity and price for use under the mode of pricing by bill of quantities price contract denominated in the project to provide theoretical reference.Engineering practice,our country adopts the bill of quantities tender method is universal.Price contract,the author of this paper under the bill of quantities of integrity,procedural,included in the problem,according to the characteristics of the valuation,and the characteristics of the fixed price contract,under contract for total quantity deviation list and omissions item whether it should be included in the analysis,and from the perspective of law,demonstrates the listing of measurement principle,the amount of added into some contradictions of price contract,puts forward some related Suggestions according to these contradictions,in order to reduce the owner and the contractor shall not avoid some of the risks,reduce the construction market is the settlement of disputes.
Keywords/Search Tags:Bill of quantities, Fixed price contract, Price risk, Force of law
PDF Full Text Request
Related items