| The cost control penetration in the engineering project construction’s entire process, itsmanagement’s quality direct relation engineering project’s profit and loss, it is a project totalmanagement important link, therefore pays special attention to the cost control themanagement more and more to take seriously by the people. Through to construction item’seconomic activity analysis, clarifies project economic activity each link, namely through tocost control’s system analysis and the research, discovers the construction enterprise thehighly effective cost control method and establishes a good control system in the constructionprocess, like this, the superintendent can utilize each technical economy method correctly,carries on the optimization and the surveillance to construction item’s economic activity, helpsthe enterprise to raise the economic efficiency, the improvement project management andoperation.This paper uses data analysis, practical survey method, case study method to study theconstruction business during the construction cost control of the content. Use the basic theoryof construction cost control and value engineering theory, clearly the purpose of cost control,appropriate and dynamic process of unity; in the process of building construction, should bebased on different stages in different ways the application of value engineering theory, theproject entity function of the system analysis. Proposed construction enterprises in theconstruction process, cost control approach. Are: a clear target for cost control duringconstruction, proposed construction process cost control principles and procedures, accordingto different circumstances, select the corresponding control measures and control methods,focused on cost control during construction of five aspects of focus.Through occurs to several in Hebei Province’s project example project good and badpoints carries on the analysis, its cost control’s main experience lies in the projectimplementation process, momentarily tracks to the cost, discovered that the deviation and theprompt correction, use the advanced management, if extracts with the value engineeringreduces the cost the project object and the goal, overcomes in the construction stage costcontrol some frequently asked questions. The superintendent only then discovers the construction enterprise the highly effective cost control method and establishes a good controlsystem in the construction process, can raise the business economic benefit, the improvementproject management and operation. |