Font Size: a A A

Research Of Planning And Site Selection Method Of Straw Burning Power Plant

Posted on:2013-05-17Degree:MasterType:Thesis
Country:ChinaCandidate:L ZhaoFull Text:PDF
GTID:2232330395976497Subject:Industrial Economics
Abstract/Summary:PDF Full Text Request
Since reformation and opening China already has become the fastest growing economic country in the world. But the back of the rapid development of our country is maladies generated from the economic mode of the power rich and low output extensive style. As the world energy crisis and environmental crisis break out these maladies are more obvious. It not only greatly limits economy development speed of our country at present but also caused a far-reaching influence for future. Changing the energy strategy and using clean energy has been the new direction of development of major power company. Our country is the large agricultural nation. Straw as crops byproduct has not been reasonable used because of the traditional concept and the present situation of the rural areas. This caused not only the environment pollution but also the waste of resources. Vigorously developing straw power projects has become the consensus of major power group.Through technology introduction and technology localization Chinese straw power projects were springing up but these projects progress difficult because of the lack of theoretical research. Due to poor planning of location many straw plants has already operated appeared the situation of cost greatly increased, low profitability even loss or none of raw material. This severely limits the promotion of straw power in our country. This paper based on the actual research. Through the analysis of the status of straw plants has already operated in Hebei it find out the problem of affecting the normal operation of the straw plants. It analyzes the examination and approval process and maladies of straw power projects at present. It blends these maladies in new planning method of straw plants and establishes the evaluation system accord with characteristics of straw power and makes the evaluation and examination and approval of straw power projects more rational, Scientific and feasible.This paper with the regional scope as the limit of straw power projects planning location method. In big range area Such as province or city it adopts the fuzzy comprehensive evaluation method to construct evaluation system, introduces the concept of area suitability and makes Evaluation and comparison straw power projects in this area in order to ensure projects examination and approval optimal. In small range area Such as city, county and township it adopts none optional location method. It adopts geographical gravity method popular in logistics center location. Mainly aiming at the major cost factors of straw’s collection, Storing and transportation it finds out the location accord with the constraint condition of lowest cost. Through the actual data validation it gets the conclusion that method is feasible.
Keywords/Search Tags:straw plant, Planning of location, area suitability, fuzzy comprehensiveevaluation, geographical gravity method
PDF Full Text Request
Related items