| Energy depletion, environmental degradation is to solve the pressing problemsof human survival and development. Development of clean renewable energy for thepeople, has become the pirmary task of the development of the world, solving today’sseirous world problem of environmental pollution and resource depletion (fossilenergy) has important significance. New energy and renewable resources have theresources, sustainable, clean, well balanced characteirstics, and wind power is inaddition to the cost of water and electircity outside closest to the commercialutilization of energy, but also the world’s fastest-growing type of energy one.In recent years, China’s grid wind power industry is developing rapidly,including Inner Mongolia Autonomous Region, wind power production installedcapacity continued among the first in the country. However, due to the smaller of thepower load of the Inner Mongolia region, grid peaking capacity is limited, theoutgoing channel capacity constraints, have been affected by the scale developmentof wind power and run. Outstanding performance in the heating peirod nighttime loadlow hours, cogeneration units run atfer the peak load regulation margin, resulting inwind power the Intenret can not be run. Inner Mongolia region’s power grid, thepower structure is the inevitable result of resource constraints formed by thetechnological progress of the power grids and coal units in this pattenr, there is only acertain extent solve wind power grid difficult, wind power electircity inter-provincialoutgoing inter-network, constrained by the grid system and local interests mechanisms recently unable to quickly resolve.The thesis of the wind farm gird brownouts, research, analysis able to solve themain idea of the power rationing phenomenon of wind power as well as the shortterm to ease power rationing phenomenon several programs, and ultimately considerthe proposed use of wind power if*om the demand side to ifnd waysaltemative tocoal-fired boilers for the urban heating. Datang Chifeng Balinzuoqi wind powerheating project development as a case, the analysis related to the development of thewind power heating demonstration project background,technical design, operationmode, cost control, and eventually be able to implement the safeguards of the projectdevelopment, make wind power heating project development of science, rationalityhas been a valid argument.Wind power alternative to traditional coal-fired boilers for urban heating, it ispossible to increase the region’s electricity load,to improve the the local assimilativecapacity of wind power to alleviate grid outgoing pressure, especially in the night lowhours of power load Wind Power for townsheating, start rfom the demand side,reducing the power gird for wind power peaking and consumptive diiffculty, hasimpotrant implications for the continued development of the wind power. Storageelectric boiler is an economic and social benefits are very good sources of heat in theform, use the storage type electric boiler system, both to solve the problems ofenvironmental protection,fire protection, and management can save running costs,especially for wind power brownouts, the more serious of the three northern regions(northeast, north, northwest). At the same time, wind power heating also hassignificant environmental beneifts. Inner Mongolia is located in the northern coldregions in China,long heating peirod, in addition to a small number of large andmedium-sized cities outside the cogeneration unit, the vast majority of towns andcities also follow the traditional methods of coal-fired boiler heating, consumes a large amount of coal resources. Heating systems using wind power instead ofcoal-ifred boilers, will reduce emissions of gases such as carbon dioxide, sulfurdioxide, soot, cinders, improve the atmospheric environment,the purpose ofimproving the living standards of people’s lives has been reached. |