Font Size: a A A

Discussion Of Construction Technique And Management Mode Of Multi-storey And High-rise Residential Houses

Posted on:2014-01-20Degree:MasterType:Thesis
Country:ChinaCandidate:J P GongFull Text:PDF
GTID:2232330398461320Subject:Architecture and civil engineering
Abstract/Summary:PDF Full Text Request
All aspects involved in the construction quality of construction projects, including the standard of management mode, the rationality of the engineering design and construction phase of the normative and many other aspects, one weak link in happen, can easily affect the entire project quality and even the use of quality and safety problems. China is in rapid development phase, the engineering quality problem has been concerned by the people, how to improve the engineering quality, the need to strengthen management, pay attention to design, according to the standard construction. More high-rise residential building structure dimension is large, professional, more prone to many technical difficult problem in the construction process, and every problem has a lot of solutions, how to select the most appropriate solution is a problem that managers need to study. This paper probes into the many difficult problems that exist in the high-rise building construction management, solutions and project management mode. This paper’s main work and research conclusions are as follows:(1) according to the causes of concrete cracks, effective measures should be taken in the construction process to control concrete structure cracks, expansion.(2) through the rigorous technical and economic analysis, compared with the ordinary concrete floor, underground garage using multi-combined box of floor slab floor structures (modified), can greatly shorten the construction period, and save cost.(3) choosing mature External wall thermal insulation system, And the key control during the construction period.(4)Construction should follow the order:first reinforcement then reconstruction, the order of the reform process we will strictly according to the design and construction scheme, strengthen the process control, ensure the safety of structure and service life.(5) use appropriate project management model, Asking management for benefit.
Keywords/Search Tags:Multistory and high-rise residential houses, Cause of crack, Netbeam ceiling, External wall thermal insulation, Reinforcement technique, Structural displacement, Management mode
PDF Full Text Request
Related items