| In recent years, Weihai City Industrial Park Administrative Committee to intensify its efforts with particular emphasis on water pollution control work in the park. To some extent alleviate the Industrial Park Water Pollution situation, however, the absence of a complete system layout planning, the serious lack of global special planning guidance and control, sewage pipe laying random access, resulting in large amounts of sewage is still discharged directly into water bodies, in addition to sewers layout is not reasonable, many practical issues that need to be solved, such as how to optimize the sewage pipe network system supporting is perfect, and how the combination of planning and construction and other infrastructure; road network planning, water supply planning, agriculture irrigation planning and coordination; scientific decision-making of the government, industry guidance how to embody. In response to these problems, one is covered in the same place under the framework of the Industrial Park-wide, comprehensive drainage system layout planning seems essential.Combination of Weihai City, urban planning and Zoning land use function layout, existing and planned layout of the built-up areas, road network layout, combined with the different problems faced by the Weihai City, hydrological. A complete, rational layout of the drainage system planning is the guiding document of the next number of years, sewage pumping stations, wastewater treatment plant and the construction of the pipeline system. To-depth research and rational distribution citywide urban drainage systems; drainage collection systems, closure systems and sewage systems integration, and optimization. Planned sewage treatment plant construction scale, processing technology, the degree of processing is necessary to achieve the goal of the water environment, but also reduce the land, save the cost of water treatment.Scientific proof of the existing drainage network, drainage system, rational planning. Old city of Weihai City basically a triage system, part of the new District Combined, Combined system also retained for a period of time, the size of the set of sewers and wastewater treatment plant, covering treatment process, the degree of processing are should adapt with, and reflect, forward combination of requirements, so that a more reasonable planning, more economical, more operational. |