Font Size: a A A

Proposal And Policy Of Illegal Construction And Governing

Posted on:2014-01-08Degree:MasterType:Thesis
Country:ChinaCandidate:L L ZhengFull Text:PDF
GTID:2246330398961489Subject:Public administration
Abstract/Summary:PDF Full Text Request
With the rapid expansion of the scale of construction around the city, the problem of illegal construction has become increasingly acute. Illegal construction has seriously wasted urban land resources, seriously affected the city public safety, and seriously disrupted the market order. If this problem is not solved, it will severely hinder the development of the urban and rural economy and damage social equality.Therefore,it can lead to bad social climate.This article uses public administration theory, legal theory, and so on. I analyzed the illegal construction from the concept of illegal construction, the type and harm, combining the empirical analysis of Rizhao City Shanhaitian actual situation. According to the actual situation of Rizhao City Shanhaitian illegal construction and characteristics,I made a comprehensive analysis on the causes of illegal construction and the plight of enforcement by using the historical analysis, the comparative analysis and the empirical analysis method. My conclusions of the illegal construction of the causes are the economic interests’driving,planning unscientifically, a custom that the law fails where violators are legion,the separation of administrative law theory and practice, management system that is thoroughly according to the crux of the problem.Governing the illegal construction is the concrete embodiment of seriously planning construction order, safeguarding social fairness, the protection of the ecological environment, enhancing the image of the city, improving the living environment.The paper is divided into five parts, Chapterl is an introduction. Chapter Ⅱ is an overview of the illegal construction.ChapterⅢ is Rizhao City Shanhaitian illegal construction statuation and governance predicament;.ChapterⅣ is experience from home and abroad; ChapterV countermeasures and suggestions on how to controll illegal construction. Conclusion.In this paper, in the process of talking about the countermeasures and suggestions on governing illegal construction, I always pay attention to contacting law enforcement practice problems and dilemmas, combining my own front-line law enforcement experience to ensure that the proposed countermeasures and suggestions are targeted, Meanwhile,I also learned from the experience from home and abroad.I made my suggestions in the aspect of perfecting the planning, combining the two ways of dredging and plugging, stepping up publicity efforts, the improvement of legislation, improving the management structure and the use of scientific and technological means to strengthen the monitoring. In the process of improving the planning, combining the two ways of dredging and plugging.When making a dynamic livelihood planningand reasonably rural housing approval policies, improving the security system and protecting the legitimate needs.We must firmly say "NO to" the demolition of illegal buidingsand attack severely illegal gainers; When increasing the propaganda of both positive and negative, according to the characteristics of the targets of advocacy groups, innovative promotional contents and publicity object; perfect the law strengthen, research the introduction of a concept is clear, clear procedures and effective means operational control violation of law, or come into "Town and Country Planning Act as soon as possible to explain or supplement Ordinance clarified its fuzzy; and given administrative organs enforceable right to water and electricity, illegally built into the criminal norms in order to enhance management means. The most urgent administrative law theorists is to strengthen law enforcement Practice especially existing differences theory study, uniform application of the law to ensure the legitimacy of law enforcement; in to improve the management structure, strengthen the building at the same time, protect the players treatment and their safety, explicitly the main qualifications punishment chased and centralized problem perfect dominated by the territorial government departments to participate in the linkage mechanism, establish a reasonable the village appraisal system to mobilize the village cadres charged with an offense enthusiasm. In the scientific and technological means, the real-time monitoring of the urban planning and law enforcement measurement system to monitor illegal construction, improve administrative efficiency.Thesis put forward suggestions and countermeasures to help improve urban management theoretical system and contribute to the building of the city scientific planning and management systems, and to the rich urban sustainable development theory, contribute to serious urban planning and construction order will help mentioning government the credibility of the department. Around the city to investigate and deal with illegal construction work to provide some advice and references, and it is conducive to the acceleration of the process of the urban-rural integration.
Keywords/Search Tags:illegal construction, countermeasures, application of law, appraisal system
PDF Full Text Request
Related items