Font Size: a A A

The Research On The Rights And Task Of Supervision Engineer In Construction Project

Posted on:2013-07-24Degree:MasterType:Thesis
Country:ChinaCandidate:Y MaoFull Text:PDF
GTID:2249330371984388Subject:Architecture and Civil Engineering
Abstract/Summary:PDF Full Text Request
Our country comprehensively implementing supervision system in our country since, theengineering quality is improved. But most of the engineering quality is not verysatisfactory, and there is a need to improve. It still needs further to play a supervisoryfunctions of supervision and management, improve the quality of construction projects,to meet the people on the quality of the project a lot of dominance and recessiverequirements, such as safety, economy, applicability, beautiful wait for a requirement.To achieve above goal, needs to construct the unit to improve the supervision work andunderstanding, to inspect manage orgnaization must be right and the corresponding task.This paper analyzes the current situation of industry of grain of our country inspect ofour country construction laws and regulations, the supervision engineer rights andobligations on the relevant provisions, foreign developed country the characteristic ofsupervision work, and supervising rights and duties in the engineering process specificreflect.One, the progress control of projectThe general principle is the overall arrangement, phase control, the breakdown ofmanagement, monthly statistical analysis. Corresponding to the schedule are respectivelyon the overall project schedule, project schedule, project schedule plan and monthlyschedule. Progress control method: according to the requirements of the contract, strictplan examination and approval, in the implementation process for the progress ofverification, timely planning, schedule deviation analysis, found that take measures tocorrect the deviation of contract. This is a move in circles in the process.Two, engineering and quality controlOverall control, the breakdown of management. Corresponding to the project is overallconstruction scheme and construction scheme. Overall construction scheme withoutapproval shall not be approved for general engineering construction; constructionscheme without approval shall not approve the project started. Quality control methodsare: prevention, supervision, inspection, test and detection, measurement, instruction,pause, pause, engineering measurement and payment control subcontracting, adhere to the program. Quality control methods forEstablishing supervision control program, according to" code for construction project","the supervision contract" and national construction supervision regulations theestablishment of supervision control program, construction, inspect manage personnelmust be familiar with and abide by. Contractor must press supervision procedures forinspection, examination, visa, must be resolutely stopped contracting units in violationof supervision program behavior.Three, engineering cost controlCost control principles for overall control, grasp the key monthly test project valuation.Cost control method, established from the supervision department of the professionalsupervision engineer to the contractor inspection staff independent work checkmanagement system based on the provisions of the contract; the methods ofmeasurement and contract drawings, the accurate accounting of engineering quantity; allchanges or scene confirmation number, shall be determined by the construction units,supervision and contractor three representatives method in surveying, establish specialcontrol account.Therefore, although our country supervision laws and regulations, the supervisionengineer ’s rights and the formulation of the task more perfect, also have goodinternational practice can draw, supervision of rights and duties in the engineeringprocess has specific embodiment. However, in the project implementation process, thereare still some problems, to the supervision engineer in practical work to bring certaindifficulty, supervision engineer can independently, impartially to deal with constructioncontract related matters, not its supervision function embodiment.One, inspect manage engineer power and assignment problemsThe stage of bidding supervision engineer no participation right; the project owners toinspect manage job is not enough attention; at present of our country engineeringsupervision system is not perfect; administrative leadership intervention, make inspectmanage engineer job is difficult to adapt to.Two, improve the right of inspect manage engineer and mission proposalsIn charge of the industry sector in the regulations further explicit supervision rights and obligations; should make supervision work more specification into engineeringconstruction contracts; our country laws and regulations should be clearly stipulated inthe bidding supervision engineer should be intervened before supervision; supervisionengineer should have at least the project quality, progress and investment of the threefunctions.
Keywords/Search Tags:Constron projecuctit, Supervision engineer, project management
PDF Full Text Request
Related items