Study On Construction Management Information System Of Pushihe Pumped-Storage Power Station

Posted on:2012-01-20Degree:MasterType:Thesis
Country:ChinaCandidate:H W XuFull Text:PDF
GTID:2249330374464572Subject:Project management
Abstract/Summary:PDF Full Text Request
Pumped Storage Power Station, with peak shaving, valley filling, phase modulation, frequency modulation, emergency reserve, and replace the role of coal-fired units that can effectively adapt to rapidly changing load, maintain the safe operation of power grid, thus it brings significant economic benefits. As the society of energy saving, development of clean energy strategies and supported policies, the construction of pumped storage power station has been developing rapidly in recent years, which have broad prospects for the future.Along with the development of modern information technology and the wide application of project management, project management, information becomes the project management, including the research focus of pumped-storage power station project construction investment, construction period, is a capital intensive and tech-intensive blend of complex system engineering, control engineering investment, ensuring the quality of projects, ensure safe, effective control of the capital construction project cost, reduce financial management level and improve working efficiency, etc, to ensure smooth completion of construction project, since most of the construction enterprises are facing a problem.PuShiHe liaoning pumped-storage project as the background of this paper,,information management system was introduced application design and development of the whole process of implementation, combining mainly include pre-project, basic design, engineering construction, installation, standard production stages, The implementation of the project, including the design of construction, supervision and construction contractors, owner of the comprehensive and effective management, True to the project schedule, investment, quality, safety, equipment management, documentation control, etc. In data collection and contract project control as its core, schedule, quality, safety and control target for investment, with complete production standards as a means of accounts, the comprehensive project management mode.
Keywords/Search Tags:pumped-storage Infrastructure management, management informationsystem, project management
PDF Full Text Request
Related items