Font Size: a A A

Analysis And Countermeasures To Engineering Project Management Problems Of DJ Water Co.

Posted on:2013-09-29Degree:MasterType:Thesis
Country:ChinaCandidate:X TangFull Text:PDF
GTID:2249330374475817Subject:Business Administration
Abstract/Summary:PDF Full Text Request
The organizational analysis of enterprise includes five parts: Target system,Organizational structure, Job roles, Running processes, Corporate culture.Target system is thebrain center, Organizational structure is the limb bones, Job roles is the blood cells, Runningprocesses is the neural network, Corporate culture is the genetic code. A corporation showedin the world vividly by the composition of these five parts.Organizational analysis must startfrom these five parts. From the beginning of target system to the end of corporate culture,Gradually sort out the function of the five parts running in the enterprises overall operation bychronological order, find out the strength and weakness and the whether the connection withother parts works smoothly. Finally, identify the weak links.Construction project management is a full range of planning、organization、 control andcoordination to achieve the required quality、time limits and budget for expenditure of theproject.It aims for studying how to achieve project objectives effectively, and for planning,organization, coordination and control of the project in accordance with the internal logicbased on the project manager responsibility system.The construction project is disposable,and therefore need to apply the Perspectives, theories and methods of system engineering,which possess characteristics of comprehensive, scientific and procedural.The essential productive factors include materials, machinery and equipment, technologyand capital,which,with collection, correlation, objective and adaptation to environment,is acombination of the three-dimensional multi-dimensional relationship,and it indicates that theproject is a systematic construction,construction project management is a systematicmanagement.Strengthening the project management have to analyse the essential productivefactors amply, and study and strengthen the factors management carefully.This article aimed at the problem occurred in the project management of DongjiangWater Corporate. Using the organizational analysis method to find out the problems by focuson the organizational structure、running processes and corporate culture. Combining theanalysis of project management model, figure out effective strategies and solve the problem.The achievement of research can be provided to the project manager of the someindustry and offering new thinking model to solve the management problem. Besides, it alsocontribute to improve the project management level of the same industry. Project managementis a dynamic process, the problem would be change constantly. Hence, seizing the themanagement points of this article, taking the effective measure against the problem, thedifficulties will be break individually.
Keywords/Search Tags:engineering project management, problem analysis, project management, Management Strategies
PDF Full Text Request
Related items