Font Size: a A A

The Research Of Tendering And Bidding Onthe Mode Of Engineering Genenal Contract

Posted on:2013-11-11Degree:MasterType:Thesis
Country:ChinaCandidate:R P YinFull Text:PDF
GTID:2249330377953731Subject:Architecture and Civil Engineering
Abstract/Summary:PDF Full Text Request
In recent years, engineering general contract mode in the international project is developing very rapidly, and has become the main project contract implementation mode, but in the project contract in domestic market, engineering general contract project is only10%or so, and mainly in petrochemical industry, chemical industry, electric power, metallurgy and other professional engineering field. That the housing construction and municipal infrastructure engineering general contract project have smaller market share, not only affect the construction enterprise economic directly, but also lead to China building at disadvantage when compete with foreign corporations. Promote engineering general contract is inevitable requirement to deepen our engineering construction project organization mode reform, improve the level of management of project construction, and ensure the quality of projects and save the project investment, enhance the comprehensive strength, speed up the integration with the international project contracting and management.To promote engineering general contract mode vigorously is the only way for the development of construction industry.Fittest and municipal engineering related to social public benefit and the social public security from human, market environment, as well as the relevant national laws and regulations restrict, contractor bidding mode in the fittest and municipal engineering used in very few. Usually it can reduce the risk of design and construction that design and construction was finished by different contractor, but it against the construction period, quality and investment control, if we use contractor bidding it can better control engineering investment, schedule and quality.This paper expounds the model research background, purpose and meaning of the general contractor and through the contrast analysis of domestic and foreign engineering general contract market development,it found that the implementation of engineering general contract existing problems and puts forward related Suggestions. Then it introduced the engineering general contract model of the definition, feature, the difference between the traditional mode, the advantages and limitations of engineering general contract model, and research the tender and bidding model based on the general contractor separately and analyze the problem appears during compile the qualification documents, bidding documents,tendering documents Finally,this paper analyze the method of the bid evaluation in detail on the basis of my own work practice and the example of Ameco production areas boiler room of construction and demolition project EPC contractor bidding and study of the contrast the traditional bidding model and at last conclude that EPC contractor mode can shorten the project bidding time,save the time limit for a project and ensuring the quality the projects and have other aspects of the advantages.It also mention the risk in using general contractor tender and bidding at the fittest and municipal engineering.At last it put forward that the improvement scheme and suggestions that can promote this mode’s using in the fittest and municipal engineering...
Keywords/Search Tags:Engineering general contract, Housing construction and municipalinfrastructure, EPC engineering, Bidding
PDF Full Text Request
Related items