Font Size: a A A

Research On Evaluation Of Performance Of Wind Power Equipment Operation Preventative Maintenance Project

Posted on:2013-02-19Degree:MasterType:Thesis
Country:ChinaCandidate:X B LiuFull Text:PDF
GTID:2249330395476579Subject:Project management
Abstract/Summary:PDF Full Text Request
Facing the situation of the contradiction between energy supplying and demanding which is more and more nervous and power demand rises. Wind power effects to highlight in reducing environmental pollution, energy structure adjustment and solving remote residents electricity problem side. So in the long run the wind power industry is still worth looking forward to the future. However, in recent years Chinese wind power equipment accidents exposed problems in the rapid development of the industry, also exposed lag of wind power enterprise management. Compared with the speed of development, The restricted accidents that led by equipment maintenance technical lag become one of the important reason of china wind power business development.The traditional wind power equipment operation and maintenance work is usually after the wind accident, relying on site maintenance personnel to find faults, troubleshoots, and repair plan is not in accordance with the actual state of equipment. This" lag" maintenance way has not been able to effectively deal with the wind power business frequent wind power accident. At present, the equipment running preventive maintenance which is set up by several foreign wind machine manufacturing enterprises can be a very good solution to the traditional maintenance lag problem. On the current wind power enterprise technology level, it cannot solve the equipment operation and preventive maintenance key technical issues, often through the project, relying on Professional Company to do.Wind power equipment operation preventative maintenance project mainly includes the installation of the wind towers and development of system software, aiming to equipment operation with on-line detection and fault diagnosis, identify fault of the early warning signs, the fault positions, failure serious degree and the development trend to make judgments, so as to determining the best maintenance time of each part. Fundamentally, making up the lag of traditional equipment operation and maintenance. But now, with the objective implementation having not been popular, its implementing performance is not know. The implementing performance has become the focus of attention of many wind power enterprise.Firstly, this paper introduces the wind power equipment operation preventative maintenance engineering projects, and according to the characteristics of the engineering project, find out the deciding factor that influence of the performance. Then, projecting the performance evaluation theory as a foundation, standing in the angle of wind power industry, construct the wind power equipment operation preventative maintenance project performance evaluation index system, in order to assessment the project performance. In order to getting reasonable allocation of resources, the standard to engineering project investment channel, perfect project evaluation for the purpose. By combining the da tang group new energy Co., LTD for the project implementation of empirical analysis, apply the performance evaluation system, and analysis the evaluation result for the project to provide theoretical reference for the performance evaluation.
Keywords/Search Tags:Wind Power Equipment, Preventive Maintenance of Equipment Operation, Engineering Project, Performance Evaluation
PDF Full Text Request
Related items