DY Pharmaceutical Company Wastewater Treatment Project Research

Posted on:2013-04-04Degree:MasterType:Thesis
Country:ChinaCandidate:X X WangFull Text:PDF
GTID:2249330395954464Subject:Project management
Abstract/Summary:PDF Full Text Request
With the rise of project management in China, its significance and value has been paid more and more attention, and has also been increasingly common applied today. It has been more and more important that the role and value of project management in the project implementation and directly determines the project implementation results good or bad. Construction project management is one of project management, and compliance with the general rules of project management, but due to the long duration, the huge amount of investment, the long payback period, and the uncertainties of environmental changes during the construction, all these factors make the Construction project management has its special mode and characteristics different from the general project management.Construction project management in China is generally taken to be jointly managed by several departments of the funders, contractors and supervisor, each department has its own functions and responsibilities, at the same time, China’s construction projects usually taking the form by Enforcement Supervisor responsible for the quality of the project management., unlike the foreign commonly used by the construction side of the project in charge of quality management. This is the formation of our unique, having unique advantages.This article takes the project construction of DY pharmacy wastewater treatment as the background, as the basis of modern project management theory, and researches the project management model suitable for the construction of the modernization project. DY pharmacy wastewater treatment construction project management system is involved in the relevant departments of the state under the supervision of the owners, design units, construction units, supervision units, suppliers and other multi-project management activities. The project management of DY pharmaceutical factory project takes the organizational model suitable for the modernization project management, and builds the organizational structure with the functions department, and takes in-depth research on the construction project management elements. Later in the article proposed the implementation mode of the project management of the DY pharmacy wastewater treatment management, the basic system of practice, organizational structure and project management element etc. It won’t ensure the smooth implementation of the construction project unless we doing good job in the management of construction projects.
Keywords/Search Tags:Pharmaceutical Compally, Sewage Rreatment, Project Mauagement, Optimization of Project Plan
PDF Full Text Request
Related items