Study On The Risk Identification And Management Strategy T Of Boiler Construction Project Of Jilin Chemical Industry Co. Ltd

Posted on:2014-01-20Degree:MasterType:Thesis
Country:ChinaCandidate:F WuFull Text:PDF
GTID:2249330395977910Subject:Project management
Abstract/Summary:PDF Full Text Request
As a production service company of CNPC Jilin Chemical Industrial Company, the power plant has been already30years. Its boiler equipments are aging, and its system is running in high failure rate. The Boiler Construction Project of Jilin Chemical Industry Company is the new construction and renovation project which is on the condition of meeting each plant’s heating load of each season and heat source spare to change the old and backward status quo of equipment. Since the power plant belongs to the corporate-owned power plant, the boiler construction project’s costs, quality and construction period are not only related to the interests of the unit, but also impact on the production safety and operating costs of the production unit directly. The project’s risk is on a relatively high degree. So it is important to strength the risk management and identification of the boiler construction projects and develops effective risk control strategy.As background to the boiler construction project, this paper closely combines with the project risk management theory and the practical application and use the decomposition analysis, financial statements and sensitivity analysis to identify, assess and analysis the boiler construction project risk management. This paper also summarizes up the risk of financial analysis sensitivity to risk, price risk, the risk of quality variation, heat output risk, project risk, thermoelectric products supply risks and other important risk in the project. These risks will have a significant impact on the construction schedule, engineering quality and production safety of the projection. The paper proposes corresponding management programs and response measures.Through the study on the risk identification and management strategy of Boiler Construction Project of Jilin Chemical Industry Company, it saves the investment funds and avoids the risk of construction. It also promotes the smooth implementation of the project and provides a reference for the risk management of construction projects in the same industry.
Keywords/Search Tags:project investment control, the whole process management, Dynamiccontrol, Earned value method
PDF Full Text Request
Related items