Research On Cost Management Of Steam Pipe Network In Dalian Power Supply Company

Posted on:2014-02-15Degree:MasterType:Thesis
Country:ChinaCandidate:L L WangFull Text:PDF
GTID:2249330395994816Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
With the increasing environmental requirements for the cogeneration rapiddevelopment and urban construction, the scale of China’s central heating expandingthermal power plants and large heating network project, to ensure the reliability andstability of the heating, not only to save energy, improveenvironment, improve thequality of heating at the same time, people’s living standards improve, there aresignificant economic, environmental and social benefits. In recent years, the steampipe technology has been rapid development, corresponding to this project costmanagement with the changing and different emphases.The purpose of the cost management based on the lowest possible cost toensure project quality and effect, First, the projects in the pipeline of the steam pipenetwork engineering characteristics Buried must guarantee quality, and emphasizingthe tube base construction to overcome quality common problem.Large projects,long pipe network cable, short construction period, the construction site is narrow,must increase investment, guarantee period. In this paper, the characteristics of theDaihatsu heating steam pipe network project cost management, material costs, laborcosts, costs of subcontracted work, responsibility cost management, find out theproblems of the steam pipe network project cost management, the proposed remedies,which expounded the necessity of the project cost management.The main problemsexisting in a cost management system is not perfect; two is not attached importanceto the management and control of the quality cost of engineering project; three is notaffected pay attention to the progress of cost; four is a project management personnelcost concept is not strong; the five is the cost estimation, cost budget work notin-depth. Thus put forward the project of steam pipe network cost management Programs-cost budgeting, cost plan, set up a project management group.Andto establish the project cost management rules and regulations, management,strengthen labor supervision system of ticket of effective control measures for costmanagement. The project of steam pipe network has its unique characteristics. Thefirst is the cost of materials, materials for corrosion resistance, high temperatureresistance, moisture proof high specification material.The second is the cost oftechnology, such as the welding technical requirements of seamless welding andspiral seam welding of high welding technology. Project cost management startsfrom the project cost characteristics, targeted to take measures, to plan, to strengthenproject cost management objective. The implementation of safeguard measures inproject cost management, the main emphasis on establishing cost managementsystem, not to the rules, not Cheng Fangyuan, regulations restrict strictly willincrease the cost management, the cost management more effective.Safety andquality management is the basis of cost management, only to ensure safety andquality to make the project a smooth and orderly. Preparation of internal constructionquota management is to control the cost of quota, quota management is the effectivemeasure of cost management.The current condition of the market economy, the whole process of project costmanagement throughout the project, any small do not influence may have causedirreparable the whole project cost. The implementation of the project costmanagement is the effective means to reducing efficiency, study and find out theeffective control method for the effective control of project cost is the main objectiveof cost management.
Keywords/Search Tags:Steam pipe network, Construction Project, Cost Management
PDF Full Text Request
Related items