| With the reform and opening policies going further, China’s approach to non-profit government investment project construction transits to the agent construction system. Project owner mode, Project headquarter mode and Capital construction division are common types of management before. The agent construction system applied in Xiamen City firstly in China. In1993, a part of infrastructure and social public welfare project used agent construction system. In2004, the State Council promulgated "The decision on the reform of the investment system". The decision made clear to accelerate "agent construction system" in the non-commercial project invested by government. By the government calls on, other cities carry out agent construction system in succession, represented by "Shenzhen Mode" and "Shanghai Mode".Non-profit government investment projects are constructed by State-owned investment (all kinds of State-owned Investment Company) as project agent. The State-owned Company hand project to user then. The advantage of agent construction system is separation of "investment, construction, management and using". The system maximum technological superiorities of professional manage administration, avoid the unprofessional of amateur and prevent the corruption while constructing as far as possible. At present, provincial, municipal and county-level invest companies are founded. As the agent owner, its affiliated professional team can able to provide the protection of engineering technologies and economical consultation, so as to ensure the smooth implementation of the project.The agent construction system of township government investment project is different from State-owned investment in the paper. Because township government lack of State invest platform, engineering technological and economical staff. It is a mode that township government is the main body of construction, and constructor manage and service project coordinated by the manage administration. According to the characteristics of tight and strenuous schedule, the key points are survey and design stage, bidding stage and construction cost control in whole process control. The premise is guarantee of project quality. The township government investment projects have the characteristics of period and region particularity. Because of less research, the paper studies township government investment project cases, and explores the whole process control system. The paper analyses typical problems in township government investment project by case analytical method such as complex approval procedure of planning and design program, lack of geological prospect material, random in the design, ineligible bill of quantities and complex approval procedure of additional investment. The paper analyses and summarizes the whole control measures for township government investment project. |