With the rapid development of city construction,power grid construction projectpresents the fast growth situation.How to ensure the completion of better and fastertransmission line construction project is Suzhou power supply company line department aurgent problems, but also a matter management mode optimization problem.This article analyzes the Line department of Suzhou power supply companymanagement status, work flow, organization structure, personnel management, qualitymanagement and material management, and reference for the domestic and foreignadvanced project management mode and in The ISO9001quality management systemrequirements, compared with Jiangshu power transmission&transformation company inconstruction project management organization structure, and realize the Line departmentorganization structure and construction project management of adjustment andoptimization, formed a suitable for current administrative management systemrequirements and project management demand line project management new mode. |