Font Size: a A A

7.63m Coke Oven Reformation Process Design

Posted on:2013-11-03Degree:MasterType:Thesis
Country:ChinaCandidate:F SongFull Text:PDF
GTID:2251330392970799Subject:Chemical Engineering
Abstract/Summary:PDF Full Text Request
Because the lack of technology application to7.63mcoke oven in china,ShandongYanKuang international coking company demolished and rebuilt the first7.63m cokeoven engineering project from Germany. Howerer,after5years application,manyproblems occurred,such as the system instable,the high temperature in the top space ofcoke oven.At the same time,the design requirement of coke production andtechnology targets can not be achieved. It is difficalt to maintain normal production ofcoke oven in YanKang international loking company.According to the actual production problems for the7.63m coke oven, the cokeoven heating lerel and a series of processes equipments were remade and optimizedbasing on the literatures, the German design drawings and some mature and safetechnical designs.At the same time,the coal charging,coke pusher,coke qutnching carwerereformed.A ground dust removal station and gas tank were added.After a seriesof reformation the7.63m coke oven can be used well and the normal production canbe achiered in YanKang international coking company.Yankuang international coking introduced Germany to Kaiserstuhl coking plantcoking equipment (move) will be China coking technology advance at least20years.
Keywords/Search Tags:Coke Oven, Carbonization Chamber, coking equipment, cokingprocess
PDF Full Text Request
Related items