Font Size: a A A

Fh Electronic Ceramic Material Manufacturing Worker Distribution Optimization

Posted on:2014-11-22Degree:MasterType:Thesis
Country:ChinaCandidate:Y S SongFull Text:PDF
GTID:2251330425476780Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
With the decrease of geographical differentiation, local job opportunities and incomelevels are no longer a dozen years ago, and there is a big difference. Manufacturingenterprises are increasingly facing labour shortages such as Guangdong coast. In the case ofindustrial automation levels in China is relatively backward, a direct result of currententerprises management sharp increase in labor costs in the production process, whilerelatively low productivity. Under this situation, it is necessary to an analysis of theproduction process of the enterprise, to optimize the configuration of the production staff.FH electronic ceramic production in this article as an example, in the case of productionequipment is currently not fully automate, proposed the adoption of the knowledge acquired,study on intermittent production line balance, with appropriate adjustments, and the linearprogramming theory as the basic tool, appropriately adjusted staffing analysis andoptimization of the production line, in theory Gets the support of change management andprocess optimization.According to existing of equipment configuration and determines of processingtechnology, analysis work constraint, and technology order constraint, and equipmentconstraint conditions, system analysis processes process work in the of program relationshipand labor fixed time, adjustment process work content, uses linear planning theory knowledgeestablished mathematics model and solution method, on adjustment Hou of processespersonnel configuration for optimization, to obtained minimum personnel configuration andmaximum outputs, improve productivity, achieved benefits maximize. And into actualproduction in the final results, validation through the production process optimization andlinear programming theory in optimization of electronic ceramic materials production staffactive in guiding significance.
Keywords/Search Tags:intermittent Production, linear programming, manufacturing worker distribution, Optimization, time quota
PDF Full Text Request
Related items