Font Size: a A A

The Research On The Cost Management Of NTC4400T Press Construction Project

Posted on:2015-03-07Degree:MasterType:Thesis
Country:ChinaCandidate:Z G HaoFull Text:PDF
GTID:2251330425484322Subject:Business administration
Abstract/Summary:PDF Full Text Request
Along with the developing of the meticulous of the socialized labor division, the project cost management is also put into the trend of complication and diversification. Since the drastic marketing competition has forced the machine manufacturing project cost be compressed progressively, it gives a direct affection on the importance of how to identify the different factors during the project implementation, find out the real factor which gives the cost impaction, draw out the reasonable action and take the effectively project management, based on the full and accurate earlier stage preparation, specific and precise middle stage management and solid and steady ending analysis.Through the cost composition, impact factors and performance analysis of NTC4400T press line manufacturing and assembly project which implemented by FAGOR Metalforming Machine Tool Ltd. Co, analyzed the main project cost and general cost composition influence via comparative method, specifically analyze the cost of each item during the project implementation, compare the detail cost via target cost management, earned value management and factors analysis approach, give out the particular data and statistics, find out the real cost impaction factors through the comparison between the nominal cost and real cost. In order to sum up the experiences for the following projects, accelerate the more effective project cost management of the enterprise, enhance the project cost analysis, for the better economic benefits. Meantime, hope through the research of the cost of this project, the experience can be also used as a reference for the similar mechanical manufacturing project cost control management.
Keywords/Search Tags:Project cost management, target cost management, earned value management, factor analysis approach
PDF Full Text Request
Related items